Home Property Australia New metering requirements start 1 September 2014

New metering requirements start 1 September 2014

  • August 27, 2014

New metering requirements start 1 September 2014

New requirements for individual metering for some new multi-level buildings will commence on 1 September 2014.

In summary it will be:

  • mandatory for all buildings with residences to provide the plumbing for individual meters
  • mandatory for strata and stratum subdivided buildings to provide individual meters
    • optional for non-strata/stratum subdivided buildings to provide individual meters
    • optional for most commercial buildings
    • optional for existing buildings

     

    Providing for individual metering of units will involve:

    • a single water inlet and plumbing for each unit. The inlet must not serve more than one unit
    • plumbing for the meters in a common area, not inside each unit. This will allow for easy access and maintenance.
    • a space and power for a data logger (if necessary).

     

    The Accredited Metering Suppliers are Enware Australia Pty Ltd and Itron Australasia Pty Ltd.

    Members can find out more by reading the MLIM Guide, visiting Sydney Water’s website, or emailing [email protected].